Electrical Permit in Boston, MA

Permit Summary

Permit status
Permit required
Official permit name
Electrical Permit
Fee
Boston charges a $20 application fee plus a scope-based amount. For an electrical service upgrade or new service, the current City page states $0.25 per amp up to 240 volts, or $0.75 per amp over 480 volts. With no service change, the fee is $1 for each fixture, plug, or outlet plus $5 for each approved meter. When neither formula applies, including Massachusetts state buildings, the fee is $10 per $1,000 of estimated cost in addition to the $20 application fee. Fees are due upfront.
Processing time
Boston's Electrical Permit page does not publish a fixed total issuance time. The City directs applicants to track review status in Permit Finder and receive portal email updates. Current Electrical Permit records in Permit Finder display target phase durations of 1–2 business days for Intake and Payment and 30 business days for Project Review; these are phase targets, not a guaranteed total processing time.
Inspection required
Yes

Who Can Do the Electrical Work?

Homeowner work allowed
No
Licensed contractor required
Yes

Homeowner Eligibility Rules

Boston does not allow a homeowner to apply for this Electrical Permit or perform the covered electrical work under a homeowner permit. A homeowner must hire a licensed contractor to apply for the permit and complete the work.

Contractor Rules

The permit applicant must be the licensed contractor performing the work. The application must be in that contractor's name; Boston requires a valid, unexpired Massachusetts trade license whose name matches the applicant, plus current liability insurance and the Massachusetts Workers' Compensation Affidavit.

Permit & Plan Review

Plan review required
Sometimes

Electrical Work Covered

Boston's Electrical Permit covers electrical installations, alterations, and repairs, including electrical work performed as part of gut renovations. Boston project guidance also identifies the permit for installing, repairing, or moving electrical wiring and services.

Plan Review Rules

Boston does not list electrical drawings as an all-applications document for the standard Electrical Permit; it requires a scope description, project cost, related permit numbers, and contractor credentials. Formal plans are scope-dependent: for example, Boston's new-construction building review requires electrical plans, while fire-alarm work follows a separate specialized permitting and review path.

Service, Panel & Utility Requirements

Utility coordination required
Sometimes

Service / Panel Rules

Installing or replacing electrical service, service-entrance wiring, meters, or higher-amperage panels requires a licensed contractor and an Electrical Permit. Boston calculates the permit fee for upgrading or installing service using the $20 application fee plus the published per-amp formula. If the project also requires opening non-structural walls, Boston identifies a Short-Form Permit as an additional permit.

Service Reconnect Rules

For Boston properties served by Eversource, customer-side service equipment repairs must be completed and the local wire inspector contacted before Eversource restores service. Service upgrades and other work involving the utility connection should be coordinated with Eversource as well as Boston Inspectional Services.

Low-Voltage Rules

Massachusetts licensing and electrical-permit requirements can apply regardless of voltage when electrical wiring is installed for hire. The state Board specifically states that wired irrigation or landscape electrical work is not exempt merely because it is low voltage. A narrow exception exists for qualifying security systems that have no hard-wired components, use only batteries or a standard plug in an existing outlet, and communicate solely wirelessly.

Utility Coordination Rules

Utility coordination is needed when the work affects electric service or other utility-owned facilities. Eversource provides construction and renovation requests for items such as service upgrades, service-entrance relocation, temporary drop/reattach work, and additional meters. For restoration after customer-side repairs, Eversource requires contact with the local wire inspector before service is restored.

Inspections & Permit Life

Electrical Inspection Stages

Boston requires an inspection before the Electrical Permit can be closed. The Electrical Permit page directs the contractor to request inspection after the work is finished and states that an inspector will contact the applicant within 48 hours to schedule and confirm; the licensed contractor must be onsite. Boston's general inspection guidance states that most construction work requires at least a rough inspection and a final inspection, with additional inspections for more complex projects.

Permit Expiration / Inspection Interval

Boston lists no recurring renewal period for the Electrical Permit, but work must start within six months after permit issuance. Some projects may qualify for one 180-day extension; eligibility depends on project type.

What You Need Before Applying

Requirements

A licensed Massachusetts electrical contractor must apply for the permit and perform the electrical work. Apply through the Boston Inspectional Services online portal, provide the required project and license/insurance information, and do not begin work before the permit is issued. Work must comply with the Massachusetts Electrical Code, 527 CMR 12.00, which is based on the 2026 NFPA 70 and has been effective since April 24, 2026.

Exemptions

Massachusetts Board of State Examiners of Electricians guidance recognizes a narrow no-license/no-permit case for a security system when no component is hard-wired, power comes only from batteries or a standard plug in an existing outlet, and all components communicate solely by wireless technology. Ordinary electrical installations, alterations, and repairs are covered by Boston's Electrical Permit process.

Required Documents

For all applications Boston requires a short work description identifying the scope, materials, floors and rooms involved, and related permit numbers; the estimated total project cost; front and back copies of the applicant's valid, unexpired Massachusetts trade license; a current Certificate of Liability Insurance; and a Massachusetts Workers' Compensation Affidavit.

How to Apply

Go to Official Application

Official Sources

Last verified: September 24, 2026