Electrical Permit in Everett, WA

Permit Summary

Permit status
Permit required
Official permit name
Electrical Permit
Fee
Everett's electrical fee schedule, updated January 1, 2026, charges single-family/townhouse/duplex new construction, additions or remodels by project area: under 1,000 sq. ft. $100; 1,001–2,000 $150; 2,001–3,000 $200; 3,001+ $250. Standalone garages/outbuildings $75; service/panel changes $100; 1–2 added/altered circuits without a service change $75; 3+ circuits $100; meter/mast work $75. Commercial/multifamily work uses a valuation schedule (including labor and materials): $50 for $250 or less; $50 plus 3% above $250 through $5,000; $175 plus 1.5% above $5,000 through $50,000; $925 plus 0.9% above $50,000 through $250,000; $3,175 plus 0.7% above $250,000 through $1 million; $10,000 plus 0.4% above $1 million. Commercial low-voltage work is $50 for up to 70 devices, then $50 plus $0.50 per connection over 70. Temporary service $75; hot tubs/pools $100; plan review or unspecified inspections $100/hour (one-hour minimum); reinspection $50. Additional applicable charges may apply; credit/debit card payments incur a 2.3% convenience fee.
Processing time
Everett offers over-the-counter issuance for eligible electrical permits not requiring plan review. For projects requiring plan review, city reviewers process applications in receipt order; the city does not publish a single guaranteed electrical-permit turnaround time. Applicants may track review and approval status in the online portal.
Inspection required
Yes

Who Can Do the Electrical Work?

Homeowner work allowed
Sometimes
Licensed contractor required
Sometimes

Homeowner Eligibility Rules

RCW 19.28.261 permits qualifying owners to perform electrical work without holding an electrical contractor's license or electrician certificate on property they own, subject to restrictions for construction intended for rent, sale or lease and property offered for sale within 12 months after acquisition. The statute provides a specific affidavit-based pathway for an owner of a new residential building of up to four units intended for rent, sale or lease who will personally perform the work and occupy one unit as a principal residence for 24 months; this exemption is limited to once every 24 months. Everett's electrical application requires an owner/lessee performing work under an exemption to complete its affidavit; renters/lessees must furnish owner authorization as applicable. A city electrical permit and inspections are still required for nonexempt work.

Contractor Rules

A hired electrical installer generally must hold the applicable Washington electrical contractor license and use appropriately certified electricians under chapter 19.28 RCW. The entity performing the installation must obtain its own electrical permit; two separate installing entities cannot share one electrical permit under WAC 296-46B-901(3). Everett's application asks for the Washington contractor license number and Everett business-license number. Qualifying owners and other statutory-exempt persons may perform their own work without an electrical contractor license, but must meet exemption conditions and obtain applicable permits.

Permit & Plan Review

Plan review required
Sometimes
Quick / no-plan permit available
Sometimes

Electrical Work Covered

A separate city electrical permit generally covers new electrical systems, service or feeder installations and upgrades, panel or meter alterations, added or relocated branch circuits, building rewiring, temporary power, hot tubs/pools, and regulated commercial low-voltage or alarm-system wiring. The city electrical application distinguishes line-voltage work, including services, feeders, circuits and complete rewires, from low-voltage work such as data, intercom, thermostats, security systems and fire-alarm wiring. Certain minor replacements and low-voltage work qualify for specific exemptions.

Plan Review Rules

Electrical plan review depends on facility use, scope and the Building Official's determination. WAC 296-46B-900 governs review for educational, institutional and qualifying health/personal-care facilities; it exempts specified low-voltage, lighting, retrofit, small-service, limited-load-modification and qualifying small-generation projects from formal review when its precise conditions are met. Everett's electrical application requires applicants to identify the facility type and document the reason plan review is not required, or submit applicable electrical plans. Under EMC 16.05.010, the Building Official may require plans, service diagrams, specifications and designs prepared by a qualified professional. Do not treat every commercial job as requiring electrical plan review.

Quick / No-Plan Permit Rules

Everett provides an over-the-counter permit path for eligible projects not requiring plan review. Routine electrical work that does not trigger formal review may use this process; projects requiring plan review must complete that review instead. Apply through Everett's online permitting portal; the city also offers counter assistance for eligible over-the-counter permits. An over-the-counter path is not a waiver of permitting, applicable fees or inspections.

Service, Panel & Utility Requirements

Utility coordination required
Sometimes

Service / Panel Rules

New or changed electrical service, main panels, meter/mast equipment and feeders generally require a City of Everett Electrical Permit. The city publishes a $100 single-family/townhouse/duplex service/panel change or alteration fee and $75 for meter/mast repair or alteration; fees for commercial/multifamily work are valuation-based. Identify service work on the application and supply load calculations or diagrams if required. Arrange a service inspection and coordinate the utility-owned connection or meter work with the serving utility.

Service Reconnect Rules

Electrical service requiring new or altered wiring, service equipment or repair must have applicable Everett permit and inspection approval before the utility connects or restores power. For a permitted temporary power pole, Everett expressly requires installation and city inspection approval before the applicant contacts Snohomish County PUD for connection. For an existing service affected by work, coordinate city service-inspection approval and any required utility release/reconnection rather than assuming permit issuance alone authorizes energization.

Low-Voltage Rules

Everett's electrical permit application covers power-limited/data, intercom, thermostat, audio, access, security and fire-alarm wiring; its fee schedule has a separate commercial low-voltage device category. WAC 296-46B-901 exempts certain listed Class 2 low-voltage systems, residential telecommunications work inside individual dwelling units and limited telecommunications work, but requires permits for qualifying backbone work, fire-barrier penetrations or more than ten telecommunications outlets. Electrical rough-in for a fire-alarm system does not substitute for Everett's separate Fire Alarm Permit for device locations and installation approval.

Utility Coordination Rules

Contact the serving electric utility when installing or changing utility service, requesting a meter or reconnection, providing temporary construction power or planning a grid-connected generation system. Everett directs customers to Snohomish County PUD after the city has inspected and approved a temporary power pole. Any utility-specific service design, metering, disconnection, energization or interconnection approval is separate from the Everett electrical permit.

Inspections & Permit Life

Electrical Inspection Stages

Everett inspects permitted electrical work at stages appropriate to the installation: underground/conduit or trench and grounding where applicable, service equipment, rough-in before concealment, and final after completion. EMC 16.05.010, Article 80-11(h), prohibits concealing work intended to be hidden until it is inspected and approved. Request inspections through the city's online permitting portal; the city can require at least one day's advance notice. Inspection of temporary or altered services is required before utility connection when applicable.

Permit Expiration / Inspection Interval

Everett states that issued permits expire after 180 days without work/inspections, and each completed inspection extends validity another 180 days. Request a permit extension with the reason entered through the inspection-request menu before expiration. Abandoned applications also expire after 180 days. Once an issued permit is closed after expiration, outstanding work and inspections require a new permit application, approval, fees and inspections. Everett's local 180-day process controls its permits rather than the general one-year expiration stated for state L&I permits.

What You Need Before Applying

Requirements

Obtain an Everett electrical permit before installing, altering, replacing or extending nonexempt electrical wiring or equipment at a jobsite within Everett city limits. Apply to City of Everett Permit Services, not Washington L&I; describe the work and site, comply with the locally amended National Electrical Code and Washington electrical rules, identify the qualified installer or permissible owner-work exemption, pay applicable fees, and obtain required city inspections before concealing wiring or connecting service.

Exemptions

Everett Municipal Code 16.05.010, Article 80-11(a), excepts replacement in kind and recognizes the emergency-repair provision of IBC 105.2.1. WAC 296-46B-901 also identifies limited Class A basic like-in-kind maintenance and specified low-voltage/telecommunications work exempt from state permit requirements. These exceptions do not generally cover added circuits, new wiring, service/panel alterations or materially changed equipment; an owner-work licensing exemption is not a permit exemption.

Required Documents

Electrical permit application or equivalent online entries with site address, owner/applicant/contractor contact information, building use, work description, contract value, project or work area, scope of service/feeders/circuits and low-voltage devices, and related building/fire permit numbers as applicable. Include plans, service diagrams, load calculations, specifications or supporting documents when required by the Building Official or WAC 296-46B-900; owner-installers claiming a licensing exemption must complete the applicable electrical permit affidavit.

How to Apply

Go to Official Application