Electrical Permit in Miami, FL

Permit Summary

Permit status
Permit may be required
Official permit name
Electrical Permit
Fee
Under the City of Miami Building Department fee schedule adopted April 23, 2026, residential electrical permits for up to three dwelling units are charged at 0.50% of estimated construction cost. The schedule separately lists $45 for residential improvements under $2,500 and a $110 minimum permit fee. Commercial and multifamily trade or stand-alone permits are 1.00% of construction cost through $30 million plus 0.50% of value above $30 million. All permits have a $40 nonrefundable application fee. For plan-submittal projects, the dry-run/up-front fee is $2.80 per $1,000 of estimated construction value, with 80% credited toward the permit fee. No separate general plan-review percentage is stated; revisions or reworks after the second review are $56 per discipline. City solid-waste and energy-conservation surcharges, and required State of Florida and Miami-Dade County surcharges, apply when applicable; subsidiary permits are exempt from the City solid-waste surcharge.
Processing time
For complete and sufficient applications using local-government plan review, current Florida law sets a 5-business-day decision period for qualifying electrical permits on existing single-family residences when the work is under $15,000; 30 business days for residential structures under 7,500 square feet; and 60 business days for qualifying larger residential, nonresidential under 25,000 square feet, and multifamily projects of 50 units or fewer, unless the applicant waives the statutory period in writing. Eligible City Easy Permits do not require plan review and are issued by email after the online application is completed and fees are paid.
Inspection required
Yes

Who Can Do the Electrical Work?

Homeowner work allowed
No
Licensed contractor required
Yes

Homeowner Eligibility Rules

Miami's Owner-Builder program does not allow an owner-builder to obtain an electrical trade permit. The City states that electrical permits may be issued only to appropriately licensed contractors. This does not change the separate list of minor electrical activities that are permit-exempt.

Contractor Rules

An electrical contractor must hold the appropriate Florida license and be qualified or registered with the City of Miami before pulling permits. City contractor qualification requires current license and business information, identification, local business tax information, and required liability and workers' compensation insurance documentation.

Permit & Plan Review

Plan review required
Sometimes
Quick / no-plan permit available
Yes

Electrical Work Covered

Electrical work not on Miami's exemption list generally requires a permit. Covered work includes new or rough wiring, service and panel repair or replacement, hardwired low-voltage/data systems, motorized gates/doors/shutters, certain water-heater and air-conditioning electrical work, temporary power, wiring repairs, and other electrical installations or alterations.

Plan Review Rules

Eligible Easy Permit electrical scopes do not require plan review. Other electrical applications may require electrical plan review through the City's electronic plan-review system. For applications subject to the current statutory timelines, a complete application requires a process number, upfront fees, the application and required drawings/supporting documents, required outside-government approvals, and prescreen approval. When the statutory process applies, corrections to rejection comments must be submitted within 10 business days unless the applicant has waived the timeline.

Quick / No-Plan Permit Rules

Miami's Easy Permit program is available to qualified contractors in good standing for listed small projects that do not require plan review. Electrical Easy Permit categories include light sockets, low-voltage computer/TV/phone/data cabling, motorized gates/doors/shutters, residential service repair, water-heater replacement, A/C change-out, burglar-alarm work, and specified commercial outlets, CCTV, smoke-detector and electrified-fence work. An Easy Permit cannot be used when the work is associated with an existing master building-permit application; that work must be submitted as an additional plan or sub-permit through iBuild.

Service, Panel & Utility Requirements

Utility coordination required
Sometimes

Service / Panel Rules

Electrical panel replacement is permit-required, and residential service repair is listed as an Electrical Easy Permit category. Service or panel work must be performed by the licensed electrical permit holder and inspected as required; utility-side changes may also require FPL coordination.

Service Reconnect Rules

A courtesy FPL re-activation inspection is permit-exempt when no electrical-system modification is made. When reconnection follows permitted service repair, panel, wiring, or other electrical work, the required electrical permit and inspection must be completed before utility re-energization. FPL states that it performs the reconnect after receiving the required electrical inspection.

Low-Voltage Rules

Hardwired low-voltage computer, television, telephone and data-communication work is listed as an Electrical Easy Permit category; commercial burglar-alarm prewiring and CCTV are also listed Easy Permit scopes. Wireless battery-operated or plug-in cameras and burglar alarms, and wireless battery smoke detectors, are listed as permit-exempt when no building wiring is installed or altered.

Utility Coordination Rules

Coordinate with Florida Power & Light when the project changes or reconnects utility service, requires a utility disconnect/reconnect, changes meter/service equipment, or involves renewable-energy interconnection. FPL's project process requires utility coordination for disconnect/reconnect work and FPL performs reconnection after receipt of the required electrical inspection. Solar interconnections also require FPL approval before operation.

Inspections & Permit Life

Electrical Inspection Stages

Miami requires the electrical permit holder or electrical subcontractor to request the inspections required for that permit. The specific electrical inspection types are project-dependent and are identified on the permit or permit application; permitted work must receive the required inspections and final approval. The City also offers virtual inspections for eligible inspection types.

Permit Expiration / Inspection Interval

For a single-family dwelling, current Florida law provides that a local building permit expires one year after issuance or on the effective date of the next edition of the Florida Building Code, whichever is later, unless extended by the local government. Miami allows one extension request before expiration; after the required fees are paid, the expiration date is extended 180 days. An expired permit requires the City's Permit Completion process, which, if approved, provides 180 days to complete the work and finalize inspections.

What You Need Before Applying

Requirements

Permit-requiring electrical work must be performed under a City electrical permit by an appropriately licensed contractor qualified with the City. Work must comply with the current Florida Building Code, 8th Edition (2023), and NFPA 70, National Electrical Code, 2020 Edition, plus applicable City and Miami-Dade requirements. Electrical work associated with a master building permit is processed as a sub-permit after the master permit is approved; stand-alone electrical scopes are applied for through iBuild. Required fees, plans, supporting documents, and outside approvals must be provided when applicable.

Exemptions

Miami's permit exemptions include lamp or bulb replacement; identical replacement of a damaged receptacle, switch, or breaker by a licensed electrical contractor without wiring changes; repair or replacement of a male cord plug; portable generators of 5 kW or less that are not hardwired; wireless or battery/plug-in burglar alarms, cameras, and smoke detectors with no building wiring; troubleshooting or testing without alteration; certain ceiling-fan work on existing wiring by a licensed electrician; temporary plug-in decorative lighting under 90 days; plug-in above-ground prefabricated whirlpool/spa units; and an FPL re-activation courtesy inspection when no electrical-system modification is made. Florida's 2026 single-family permit exemption for work under $7,500 expressly does not apply to electrical work.

Required Documents

Applications generally require the property and project information, estimated project cost and trade items, contractor qualifier and license information, and the applicable permit application. For plan-reviewed work, submit required electrical drawings and supporting documents through the City's electronic plan-review system. A subsidiary electrical permit must reference the approved master permit or process number. Under the current statutory review process, a complete application also includes required upfront fees, supporting documents, outside-agency approvals when applicable, and an approved prescreen.

How to Apply

Go to Official Application

Official Sources

Last verified: September 24, 2026