Electrical Permit in Richmond, VA

Permit Summary

Permit status
Permit may be required
Official permit name
Electrical Permit
Fee
Richmond's current linked fee schedule, effective July 1, 2024, applies to electrical permits. For residential 1- and 2-family work, the fee is $63 for value of work from $0 to $2,000; over $2,000, the schedule lists $63 plus $6.07 per thousand dollars or fraction thereof. For commercial work, the fee is $131 for value of work from $0 to $2,000; over $2,000, the schedule lists $131 plus $8.50 per thousand dollars or fraction thereof. A 2% state surcharge is added to the final calculated permit fee. Value of work is the higher of the contractor estimate or RS Means price. Other applicable fees, such as reinspection or permit-extension fees, may apply.
Processing time
Richmond does not publish one electrical-specific turnaround for every scope. The Bureau's current review goals are 3-5 business days for online submittal review; initial plan-review goals are 5-10 business days for projects valued at $1 million-$1.5 million, 10-20 business days for $1.5 million-$10 million, and 20-30 business days or more for projects over $10 million, depending on size and complexity. Review clocks stop while awaiting applicant information, and other City departments may take longer.
Inspection required
Sometimes

Who Can Do the Electrical Work?

Homeowner work allowed
Sometimes
Licensed contractor required
Sometimes

Homeowner Eligibility Rules

An owner may apply for qualifying work when a Virginia contractor-licensing exemption applies, but Richmond requires an Owner Statement and proof for an owner applicant using that exemption. A principal statutory pathway covers a person who performs or supervises construction, repair, or improvement of no more than one primary residence owned by that person and for that person's own use during any 24-month period. Other statutory owner exemptions exist for specified property and use situations. Exempt owner work remains subject to the VUSBC, permitting, and inspection requirements.

Contractor Rules

When the work is performed as contracting for others, the applicant must provide the required Virginia contractor licensing or certification information; Richmond's electrical application states that the state contractor license and City business license must be on file before a permit is issued. Virginia also regulates individual electrical tradesmen who perform electrical work for the public for compensation, subject to statutory supervision and exemption rules. An applicant who is not subject to contractor licensure must file the required written exemption statement.

Permit & Plan Review

Plan review required
Sometimes
Quick / no-plan permit available
Sometimes

Electrical Work Covered

Richmond's Electrical Permit is used for new electrical work on private property, inside or outside a building. Under the VUSBC, a permit is generally required for installations or alterations involving electric wiring unless a specific exemption applies. Richmond's application and plan-review materials also address service and feeder work, panels and switchboards, generators, lighting, equipment, site electrical work, temporary power, photovoltaic systems, and low-voltage work where permit requirements apply.

Plan Review Rules

Formal electrical plan review depends on scope. Richmond's current Electrical Plan Review Requirements identify several categories that typically do not require plans to obtain the permit, including electrical connections for elevators; exterior temporary power poles unless a transformer changes voltage; low-voltage and security projects other than fire alarm plan requirements; single- and two-family dwelling projects; underground or under-slab raceway; fiber-optic-only projects; and like-for-like equipment replacement when stated in the application description. Richmond may require plans at its discretion. Projects that require plans must follow the City's PDF plan standards and applicable checklist, one-line, load, equipment, energy-code, service, and other project-specific documentation rules.

Quick / No-Plan Permit Rules

Richmond identifies an over-the-counter permit path for work that does not require plans. The City specifically warns that if plans are submitted for a no-plan condition, the application will be placed in the plan-review queue; applicants seeking the over-the-counter path should not submit plans. This does not eliminate the permit itself when the work is permit-required, and it does not override state permit exemptions.

Service, Panel & Utility Requirements

Utility coordination required
Sometimes

Service / Panel Rules

Service, feeder, and panel work is subject to the electrical permit and applicable inspections unless a specific exemption applies. For plan-reviewed work, Richmond requires a one-line diagram for new or relocated service, separately derived system, or feeder equipment or conductors, and requires load calculations for new or revised loads. New services require a Dominion Energy fault-current letter when plans are required. The permit application requests the Virginia Power/Dominion inquiry number and service size. Richmond also requires the installing electrician or qualified representative to be present for release-of-service-change inspections and inspections of service equipment after the utility connection is complete so equipment can be safely de-energized, opened, and closed for inspection.

Service Reconnect Rules

For emergency work needed to restore power to an occupied building, Richmond directs applicants to apply in the Online Permit Portal and then email the address and application/plan number to the designated permit staff. For service-related work, the City may need to complete or release the required inspection before utility energization or reconnection. Dominion Energy states that service disconnected at the request of a public authority will not be reconnected until that authority authorizes reconnection, and its new-construction process requires the applicable electrical inspection before the meter is set.

Low-Voltage Rules

Under VUSBC Section 108.2, qualifying wiring and equipment operating at less than 50 volts, broadband communications, certain exempt systems, and dwelling monitoring or automation systems are permit- and inspection-exempt unless they are in a plenum, penetrate fire-rated or smoke-protected construction, or are components of listed systems such as fire alarm/detection/suppression, smoke control, fire-protection supervisory, elevator fire-safety control, access or egress control, delayed locking or latching, fire dampers, or door control. Richmond's electrical plan-review guidance says low-voltage and security projects generally do not require electrical plans, but low-voltage security access/egress control systems and fire-alarm work use separate permits; Richmond's forms page states that security projects require a permit but no plans.

Utility Coordination Rules

Utility coordination is required for scopes that affect electric service, such as new service, temporary service, service upgrades, meter work, or other utility-side changes. Richmond's electrical application requests the Virginia Power/Dominion inquiry number for this work. Dominion Energy directs customers, builders, developers, and electricians to create a work request, provide service/load and site information, meet its metering and service requirements, and complete required local electrical inspections before the meter is set or service is energized. Ordinary branch-circuit work that does not affect utility service does not ordinarily use this service-coordination process.

Inspections & Permit Life

Electrical Inspection Stages

Inspection stages depend on the work. Richmond's current residential permit guide requires electrical materials, equipment, and systems to be inspected before concealment and requires a final inspection. Project-specific electrical inspections may also occur for underground or under-slab work, rough-in stages, and service equipment. Richmond specifically requires the installing electrician or qualified representative to be on site for release-of-service-change inspections, generator inspections, and inspections involving service equipment after utility connection so the equipment can be safely handled.

Permit Expiration / Inspection Interval

Under the currently effective VUSBC, the building official may revoke a permit if authorized work is not commenced within six months after issuance or if the work is suspended or abandoned for six months. Electrical permits are not revoked on that basis while an associated building permit remains in effect. Substantive progress may be shown by at least one approved inspection within a six-month period or other evidence of substantial work. On written request, the building official may grant one or more extensions of up to one year each. A permit application itself is deemed abandoned six months after filing unless pursued in good faith or a permit has been issued, subject to extensions for justifiable cause.

What You Need Before Applying

Requirements

Obtain the Electrical Permit before permit-required electrical work begins and use Richmond's Online Permit Portal for residential and commercial electrical applications. The work must comply with the currently enforced 2021 Virginia Uniform Statewide Building Code and 2020 National Electrical Code. Applicants must provide the licensing or statutory exemption information required by Virginia law and Richmond's application process. Electrical work associated with a building project is handled under a separate trade permit. State law allows emergency construction, alterations, or equipment replacement to begin in limited circumstances, with the permit application due by the end of the next working day unless the building official authorizes otherwise.

Exemptions

Virginia's currently effective VUSBC exempts specified work from the permit application and related inspections. Electrical examples include qualifying wiring and equipment operating at less than 50 volts, broadband communications, and certain dwelling monitoring or automation systems, subject to listed fire-safety, plenum, rated-construction, access/egress, door-control, and similar exceptions. The VUSBC also exempts specified ordinary replacements in certain residential occupancies, including general-use snap switches, dimmers and control switches, 125-volt 15- or 20-amp receptacles, luminaires, and ceiling fans. Other work may be exempt when the building official deems it minor and ordinary and not adverse to public health or general safety.

Required Documents

The application requires the project address, owner and applicant information, scope of work, value of work, contractor and license information when applicable, and electrical-work details such as service size and equipment quantities. Owner applicants claiming a contractor-licensing exemption must submit Richmond's Owner Statement and supporting proof. Residential trade permit applications generally do not require construction documents. When electrical plans are required, Richmond requires a single PDF plan set meeting its Electrical Plan Review Requirements, including applicable project information, drawings, load and service information, and the electrical plan checklist; all new commercial electrical permit applications require the checklist. Additional documents may include COMcheck for qualifying new lighting, a Dominion Energy fault-current letter for new service, specifications, coordination-study materials, or emergency-lighting documentation when applicable.

How to Apply

Go to Official Application