Shed Permit in San Francisco, CA

Permit Summary

Permit status
Permit may be required
Official permit name
Building Permit (new construction)
Fee
A qualifying permit-exempt storage shed has no DBI building-permit fee. For permitted new construction, current SF Building Code Table 1A-A (amended effective July 12, 2026) assesses separate valuation-based plan-review and permit-issuance fees. For valuations of $1–$2,000, the plan-review fee is $181 for the first $500 plus $8.60 per additional $100 or fraction, and the issuance fee is $206 for the first $500 plus $4 per additional $100 or fraction (combined starting amount $387). For valuations of $2,001–$50,000, fees begin at $310 plan review plus $266 issuance for the first $2,000, then add $28.35 and $8.56, respectively, per additional $1,000 or fraction. Higher valuations use the subsequent Table 1A-A tiers. The California Building Standards Commission fee is at least $1 ($4 per $100,000 of valuation, prorated); applicable Planning, additional review, trade, and other agency fees are extra.
Processing time
DBI does not publish a fixed shed-specific approval time. Timing depends on application completeness and any Planning or interdepartmental reviews. For applications filed on or after June 21, 2026, the normal deadline to complete review and obtain the permit is 730 days after filing; this is an application-expiration limit, not a promised processing time.
Inspection required
Sometimes

Do You Need a Shed Permit?

Building permit size threshold
One-story detached sheds for eligible storage/playhouse uses with no more than 120 square feet of floor area are exempt from a building permit under current SF Building Code Section 106A.2(1). A shed exceeding 120 square feet requires a building permit. Within required yards, Planning Code Section 136(c)(23) separately limits qualifying detached structures to a combined 120 square feet measured at grade.
Building permit height threshold
The building-code exemption requires a one-story detached accessory structure. DBI's October 2025 storage-shed guidance and Planning Code Section 136(c)(23) identify a maximum 10-foot height measured from yard grade to the top of the structure for an ordinary exempt yard shed. A shed taller than 10 feet requires a building permit and Planning review.

Exemptions

San Francisco Building Code Section 106A.2(1) exempts a one-story, detached, non-habitable tool/storage shed, playhouse, or similar accessory structure with floor area not exceeding 120 square feet from the building-permit requirement. For the ordinary rear-yard shed exemption, DBI guidance also limits height to 10 feet above yard grade and requires a freestanding, ground-level location; attachment, placement on an elevated deck, or habitable/other uses require a permit. The building-permit exemption does not waive Planning Code compliance or any required trade permit.

Attached Shed Rules

The Section 106A.2(1) exemption covers detached structures only. A shed attached or connected to a house, garage, or another building is not covered by the detached-shed exemption and requires building-permit review as applicable construction or an addition.

Shed Use Rules

The no-building-permit path is for non-habitable tool and garden-equipment storage, general storage, children's playhouses, and similar uses. DBI states that using an accessory building as a home office, workshop, study, sleeping room, art or exercise room, bathroom, or other habitable/work space requires a building permit and Planning review; these uses must also meet the applicable occupancy and building-code requirements.

Zoning & Placement Rules

Zoning approval may be required
Sometimes

Zoning Rules

Building-permit exemption does not exempt a shed from the San Francisco Planning Code. Permitted placement depends on the lot's zoning and required open areas; Planning Code Section 136(c)(23) allows qualifying detached structures as obstructions in required yards, subject to a 10-foot height limit and a combined 120-square-foot area limit at grade. Larger, taller, additional, habitable, or differently located structures require project-specific Planning review and may need another authorization.

Setback Rules

Setbacks depend on the property's zone, the required front/side/rear yards, and applicable fire-separation rules. Under Planning Code Section 136(c)(23), a qualifying detached structure may occupy a required yard (subject to the 10-foot/combined 120-square-foot limitations), but the same provision does not list these sheds as allowed obstructions in required front setbacks or over streets/alleys. For sheds needing a building permit, Planning reviews the proposed location and lot-line distances; there is no universal citywide shed setback distance stated in that exemption.

Maximum Height Rules

The ordinary permit-exempt yard shed is limited to one story and 10 feet measured from yard grade to the top of the structure. This is an exemption/yard-obstruction limit, not a general right to build larger or taller sheds; a permitted shed's maximum height depends on the applicable zoning and Planning review.

Lot Coverage Rules

For detached structures occupying required yards, Planning Code Section 136(c)(23) caps their combined ground-level area at 120 square feet; a one-foot roof eave projection beyond that limit may be allowed. Separate zone-specific lot-coverage, yard, and usable-open-space standards can further constrain the shed, and a building-permit exemption does not override them.

Special Area Rules

Additional restrictions or reviews may apply in historic/conservation districts, mapped flood hazard areas, slope-protection areas, or areas governed by special building/fire rules. For qualifying flood-zone construction, DBI calls for a licensed architect or engineer to complete a stamped Flood Hazard Zone Protection Checklist and related plans. The Building Code imposes extra submission requirements for certain new structures in the Edgehill Mountain and Northwest Mt. Sutro slope-protection areas. Check parcel-specific designations before relying on a standard shed exemption.

Construction Requirements

Foundation Rules

No separate citywide foundation-type exemption was verified for storage sheds. The building-permit exemption is tied to the detached structure's use, story count, and floor area, with zoning/location limits. DBI states that a shed placed on a deck above yard grade requires a building permit. Where a shed is permitted, foundation plans, anchorage, and structural details are subject to applicable building-code review; excavation or site conditions can trigger additional documentation.

Fire Separation Rules

A building-permit exemption does not excuse compliance with applicable fire-safety rules. For permitted sheds, DBI evaluates exterior-wall fire resistance, openings and projections, and distances to property lines or other structures under the applicable building and residential codes; requirements depend on location, building separation, construction, and use. The current Section 106A.2 exemption also expressly preserves possible applicability of Building Code Section 710A.

Permit & Review Path

Permit / Review Path

For a qualifying one-story detached, non-habitable shed of no more than 120 square feet and no more than 10 feet high, no building-permit application is needed, but zoning and trade-permit rules still apply. A non-exempt shed follows DBI's building-permit application process, with plans and Planning review for location/setbacks. Projects eligible for small-project over-the-counter review may use that path; projects requiring full plan review proceed through electronic In-House Review, with a Planning Approval Letter beforehand where required.

Trade Permits & Professional Design

Trade permits required
Sometimes
Professional design required
Sometimes

Trade Permit Rules

Separate electrical, plumbing, or mechanical permits can be required when a shed includes wiring, fixtures, piping, or mechanical systems, even if the shed structure itself qualifies for a building-permit exemption. San Francisco Building Code Section 106A.2 expressly preserves separate trade-permit requirements for otherwise exempt building work.

Professional Design Rules

A simple qualifying exempt shed does not require building-permit plans or a stamped design solely to claim the exemption. For permitted projects, DBI may require structural calculations, engineering plans or other licensed-professional documents according to the structural scope and site conditions. In designated Edgehill Mountain or Northwest Mt. Sutro slope-protection areas, Building Code Section 106A.3.2 specifies licensed-professional plans for certain new structures; applicable flood-hazard reviews also require a stamped checklist by a California-licensed architect or engineer.

What You Need Before Applying

Requirements

Confirm the intended shed use, floor area, story count, height, attachment, and site location. A shed outside the building-permit exemption needs a DBI building permit and must satisfy the applicable 2025 San Francisco Building Code and Planning Code; Planning review of setbacks and yard location is required where applicable. Even an exempt shed must comply with applicable zoning, fire, and other laws.

Required Documents

For a shed that requires a permit: completed building-permit application and Property Owner's Disclosure Form; plans identifying site address, scope and intended use, property lines, distances to other buildings and lot lines, dimensions, height, elevations, structural/foundation details, and other code-compliance information. Provide Planning approval or supporting zoning materials where required, plus engineering calculations or site-specific reports if requested. No DBI building-permit application documents are required for a qualifying exempt shed.

How to Apply

Go to Official Application

Official Sources

Last verified: October 9, 2026