Tree Removal Permit in Charlotte, NC

Permit Summary

Permit status
Permit may be required
Official permit name
Non-Development Heritage Tree Permit (also called Non-Development Heritage Tree Removal Permit); Tree Work Permit; City-approved development plan serving as a tree work permit
Fee
For FY2027 (projects passing gateway July 1, 2026–June 30, 2027), the Non-Development Heritage Tree Permit review is $215 under the individual residential lot schedule and $265 under the nonresidential schedule. Applicable residential development Urban Forestry review fees are $180 (Tier 1), $350 (Tier 2), or $405 (Tier 3); other project review fees may apply. City-approved private work on right-of-way trees has no tree work permit fee. Separately, authorized heritage-tree removal generally carries mitigation of $500 per tree for non-development or $1,500 per tree for development, subject to planting credits and exemptions; authorized City-tree removal may carry a $200-per-DBH-inch mitigation charge.
Processing time
For individual residential lot applications in Accela, the City publishes 3 business days for gateway review, 7 business days for detailed review, and 7 business days for subsequent review cycles if revisions are needed. For resident-arranged right-of-way tree work, permits are typically issued within two weeks after approval by the inspecting City arborist; arranging the initial inspection may take up to two weeks. No uniform guaranteed timeframe covers every tree-removal request.
Inspection required
Sometimes

Do You Need a Tree Removal Permit?

Private tree
Sometimes
Street tree
Yes
Diameter threshold
A heritage tree is a species native to North Carolina with a trunk diameter at breast height (DBH) of at least 30 inches, measured 4.5 feet above average ground level; the Charlotte Tree Manual excludes ash species from heritage classification. City street trees include all trees planted in the public right-of-way and naturally occurring right-of-way trees with DBH of at least 3 inches. Separately, Chapter 21 protects trees of at least 2 inches within required green areas and trees of at least 8 inches caliper within designated tree-protection zones, as well as other trees required by approved plans; these are not universal private-tree removal thresholds.

Exemptions

Ordinary private trees not qualifying as heritage trees and not otherwise protected by the Tree Ordinance, UDO, or a development approval generally do not need a City tree-work permit solely for removal. Chapter 21 provides a documented health/hazard no-prior-permit route for qualifying non-development heritage-tree removals; the development UDO separately allows an immediate-hazard removal without advance permit under its specific conditions. A City-approved development plan can itself constitute the tree-work permit. Individual tree-work permits are not needed for qualifying CDOT, CATS, or NCDOT projects whose plans include tree protections.

Protected Trees & Removal Eligibility

Protected Tree Rules

Heritage trees are protected throughout Charlotte city limits, including on private property, whether or not development is proposed. During qualifying development, UDO Article 20 also applies in the City's extraterritorial jurisdiction. City/right-of-way trees and trees in required green areas, landscape/tree protection areas, or protected under previously approved development plans require approval before regulated disturbance. Critical root zones, required protective fencing, and tree-save protections must be observed; topping protected trees is prohibited.

When Removal Is Allowed

The City reviews regulated removal case by case. For development-related heritage trees, UDO §20.14 permits removal for documented conflicts with allowable structures or improvements, unreasonable restrictions on property use or access, and specified safety/health or legal conflicts; mitigation generally applies to the first two categories but not the qualifying safety/health category. For non-development removals, Chapter 21 requires City approval except for its documented health/hazard exceptions. A public street-tree removal must be authorized following City arborist evaluation; a resident cannot independently order removal of a City tree.

Replacement Requirements

Replacement required
Sometimes

Replacement Rules

Approved heritage-tree removal generally requires one on-site mitigation tree plus a payment of $500 per non-development tree or $1,500 per development tree. Each additional qualified mitigation tree beyond the minimum reduces the payment by $250; preserving a qualifying specimen tree can satisfy mitigation for one heritage tree. The City requires mitigation trees generally to be large-maturing native species at least 2 inches in caliper and 8 feet high, unless an approved exception applies. For non-development cases, mitigation planting is normally due within 30 days after approval unless Urban Forestry approves a delay; development mitigation planting precedes release of holds. Qualifying safety/health removal can be exempt from mitigation. City-tree removal may require payment and/or replacement planting; other required trees that die or are removed must be replaced.

Arborist & Professional Requirements

Arborist report required
Sometimes

Professional Requirements

An ISA-certified arborist may certify a heritage tree's hazardous condition. Under the current development UDO, the high/extreme-risk route for extreme poor health calls for an ISA-certified, Tree Risk Assessment Qualified (TRAQ) arborist; a tree with no more than 25% live canopy may be assessed by an ISA-certified arborist. The Charlotte Tree Manual calls for an ISA tree-risk assessment and Urban Forestry preliminary review for declining-health claims under its non-development process. Resident-arranged work on City right-of-way trees, once approved by the City arborist, must be performed by a company with a certified arborist on staff. The City of Trees Canopy Care certification program is described by the City as under development, not an existing universal licensing prerequisite.

Emergency Tree Removal

For non-development heritage trees within city limits, Charlotte Tree Ordinance §21-8(g)(2) permits qualifying sufficiently diseased, injured, dead, dangerous, or declining trees to be removed without obtaining a tree-work permit first, with the required ISA certification or pre-removal photographic/video documentation; a declining tree expected to fall within 1–3 years requires an ISA-certified arborist's prior assessment. The Tree Manual calls for City preliminary review of declining-health requests and hazard evidence submitted within three days after immediate removal. For development-related heritage trees, current UDO §20.14.B.2 distinguishes an imminent or undue hazard (actively failing or likely to fail in less than two weeks, with urgent action required), removable without advance permit but with certification or adequate documentation, from extreme poor health, for which a City-issued tree work permit is required before removal at no cost and without mitigation.

Development & Special Areas

Development-Related Rules

Development that triggers UDO §20.14 includes new principal structures, cumulative built-upon area or building-coverage increase of at least 5% or 1,000 square feet (whichever is less), and standard or minor subdivisions. Applicable new projects in the city or its ETJ must address heritage trees, green area, frontage and internal tree planting, and tree-save protections in the land development/LDIRL plan review; an approved development plan serves as the tree-work permit. Tree surveys identify relevant City trees, heritage trees within 50 feet of proposed disturbance, specimen trees and critical root zones as applicable. Previously protected trees remain regulated after development, and qualifying pre–June 1, 2023 conditional zoning may remain under the legacy ordinance.

Special Zone Rules

Tree work in a Charlotte Local Historic District, including removal, may also require Historic District Commission approval through a Certificate of Appropriateness, even where a building permit is unnecessary. Tree-save/green-area sites and buffers, floodplains, or properties with conservation restrictions can involve additional site-specific protection and land-development review. Outside city limits but inside Charlotte's extraterritorial jurisdiction, heritage-tree rules operate through applicable development review rather than the city's general non-development Chapter 21 heritage-tree protection.

What You Need Before Applying

Requirements

Identify whether the tree is a City/right-of-way tree, a heritage tree, or a tree protected by prior development approval or required tree-save/landscape areas. Before regulated removal or other protected-tree disturbance, obtain Urban Forestry authorization through the appropriate heritage-tree, tree-work, or development-plan process. Document qualifying conflicts or tree condition, obtain approval of required mitigation/planting plans, pay applicable review and mitigation charges, and comply with permit conditions. Request City Landscape Management inspection before privately arranging work on a public right-of-way tree.

Required Documents

For a non-development heritage-tree application, provide a landscape-style site/plot plan showing property lines, existing buildings, limits of disturbance, heritage-tree location and size, any preserved specimen tree, proposed mitigation-tree location, and the chosen mitigation option; supply required owner acknowledgment and application/parcel information. For health or hazard claims, supply the applicable ISA arborist/tree-risk documentation or photographs/video and other evidence. Development applications may require tree survey, species and DBH data, critical-root-zone limits, protection measures, and a tree planting/green-area plan.

How to Apply

Go to Official Application