Electrical Permit in Virginia Beach, VA

Permit Summary

Permit status
Permit may be required
Official permit name
Electrical Permit
Fee
Electrical fees depend on scope. New single-phase service is $50 plus $20 per 50 amps; a change of service is one-half the new-service fee. New three-phase service is $80 plus $20 per 50 amps; a change of service is one-half the new-service fee. Additions or repairs are $50 plus $5 per circuit or feeder installed, extended, relocated, or repaired. Generator circuits, temporary service poles, subfed panels, panel or meter/meter-base replacement or relocation, pool bonding, trailer service, and overhead-to-underground work are $50 each. A 2% state levy and $10 technology fee are added. Reinspection is $75; beginning work without a permit carries a $250 administrative fee.
Processing time
Virginia Beach does not publish a fixed electrical-permit review timeframe on its trade-permit page. Under the Virginia Construction Code, permit applications must be examined within a reasonable time and a compliant permit issued as soon as practicable.
Inspection required
Yes

Who Can Do the Electrical Work?

Homeowner work allowed
Sometimes
Licensed contractor required
Sometimes

Homeowner Eligibility Rules

Virginia Beach allows an owner to obtain an electrical permit by providing the owner's name and address, approximate material cost as the contract value, signature, and any associated permit number. Whether an unlicensed owner may self-perform the work depends on Virginia licensing law and the project circumstances. One express contractor-license exemption covers a person who performs or supervises work on no more than one primary residence owned by that person and for that person's own use during any 24-month period; the work remains subject to the Uniform Statewide Building Code.

Contractor Rules

When an electrical contractor obtains the Virginia Beach permit, the City requires the contractor's Class A, B, or C state registration number, company name, contract value, and registered master tradesman's signature. Virginia law requires contractors performing work for others to hold the appropriate state contractor license, while owner and other statutory exemptions can apply. Permit applicants must provide proof of required licensure or a statement that they are not subject to contractor licensure.

Permit & Plan Review

Plan review required
Sometimes
Quick / no-plan permit available
Sometimes

Electrical Work Covered

Virginia Beach identifies permit-required work including adding or installing circuits, changing or upgrading electrical service, installing or modifying electrical wiring, new wiring and new service, relocating or replacing meter bases and panel boxes, subfed panels, temporary poles, and trailer services. The City's electrical application also covers service equipment, EV chargers, generators, photovoltaic work, pool bonding, transfer switches, and related electrical scopes. State permit exemptions apply to specified low-voltage and ordinary-repair work.

Plan Review Rules

Virginia Beach's current electrical application states that any commercial service over 800 amps requires review of sealed plans prepared by a Registered Design Professional. Virginia law also limits the professional-design exemption for electrical installations to qualifying installations not exceeding 600 volts and 800 amps, under the required licensed supervision and occupancy/height conditions; where the exemption does not apply, Registered Design Professional services may be required.

Quick / No-Plan Permit Rules

Virginia Beach offers over-the-counter service for trade permits five days a week and accepts online permit applications at any time. This does not establish a guaranteed same-day permit: scopes requiring electrical-inspector approval, sealed plans, or other review are not necessarily eligible for immediate issuance.

Service, Panel & Utility Requirements

Utility coordination required
Sometimes

Service / Panel Rules

Virginia Beach requires permits for relocating or replacing a panel box, including changing from a fuse panel to a breaker panel, and for relocating or replacing a meter base. The electrical application also lists panel and meter repair, panel replacement, service disconnect, service-entrance cable, and subfed panels. Panel or meter/meter-base replacement or relocation is listed at $50 each, with the 2% state levy and $10 technology fee added; additional circuit fees can apply when circuits are added, repaired, or extended.

Service Reconnect Rules

For service work requiring disconnection or a utility release, the electrical work must pass the required City inspection before re-energization. Virginia Beach states that residential and commercial meter releases are generated after required final inspections and other applicable approvals are complete, after which Dominion Energy can be contacted to schedule connection. For red-tag repairs requiring a permit, Permits & Inspections issues the release to Dominion after the final inspection is approved.

Low-Voltage Rules

Virginia Construction Code Section 108.2 generally exempts wiring and equipment operating below 50 volts, broadband communications systems, and qualifying monitoring or automation systems in dwelling units from permit and related inspections. The exemption does not apply when the installation is in a plenum, penetrates fire-rated or smoke-protected construction, or is part of listed systems such as fire alarm/detection/suppression, smoke control, fire-protection supervision, elevator fire-safety control, access or egress control, fire dampers, or door-control systems.

Utility Coordination Rules

Utility coordination is required for projects affecting service, meter equipment, disconnection, reconnection, or new service. Virginia Beach sends the electrical meter release to Dominion Energy after required City approvals, and the customer can then contact Dominion to schedule connection. Dominion also requires advance coordination for temporary disconnections and states that meter removal or resetting requires its authorization.

Inspections & Permit Life

Electrical Inspection Stages

Virginia Beach lists commercial new-service/new-wiring inspections as rough-in, slab, walls, trenching, above-ceiling, and final. Residential new-service/new-wiring inspections include rough-in, slab, trenching, and final. Pool wiring requires trench and final; residential subfed panels require rough-in, trench when detached from the house, and final; commercial subfed panels require rough-in, walls, ceiling, and final; panel or meter replacement or relocation, temporary poles, and trailer services require final inspection. Required stages vary by scope.

Permit Expiration / Inspection Interval

Under the Virginia Construction Code, a building official may revoke a permit if authorized work does not commence within six months after issuance or is suspended or abandoned for six months. Electrical permits are not revoked on that basis while an associated building permit remains in effect. Substantive progress can be shown by at least one approved inspection within six months or other evidence of substantial work, and the building official may grant written extensions of up to one year per extension. A permit application itself is deemed abandoned after six months unless pursued in good faith or extended.

What You Need Before Applying

Requirements

Obtain the permit before covered electrical work begins, except where the Virginia Construction Code provides an exemption or permits emergency work to be filed by the end of the next working day. Virginia Beach requires a complete electrical permit application describing the work and address. Contractor applications require the contractor's Class A, B, or C state registration number and registered master tradesman's signature; owner applications require the owner's identifying information, material cost, and signature. Work is governed by the current Virginia Uniform Statewide Building Code, which uses the 2020 National Electrical Code.

Exemptions

Virginia Construction Code Section 108.2 exempts specified work from permit and related inspections, including qualifying wiring and equipment operating below 50 volts, broadband communications, and qualifying dwelling monitoring or automation systems, unless the work is in a plenum, penetrates fire- or smoke-rated construction, or is part of listed life-safety or access-control systems. In qualifying residential occupancies, ordinary repair also includes replacement of general-use snap, dimmer, and control switches; 125-volt 15- or 20-amp receptacles; luminaires; and ceiling fans. Other work deemed minor and ordinary by the building official may also be exempt.

Required Documents

A completed electrical permit application is required with the project address, owner or occupant information, contract value or owner's approximate material cost, scope of work, and applicable service, panel, or circuit quantities and amp ratings. Contractor applications require company information, state registration number, and registered master tradesman's signature. The City's current form states that commercial services over 800 amps require review of sealed plans from a Registered Design Professional. Generator circuits and transfer switches require an approved site plan.

How to Apply

Go to Official Application

Official Sources

Last verified: October 6, 2026