Tree Removal Permit in Virginia Beach, VA

Permit Summary

Permit status
Permit may be required
Official permit name
Preliminary Project Request (PPR) — Tree Removal Submittal Form / Minor WQIA; Chesapeake Bay Preservation Area Board variance (Tree Removal in the RPA), when applicable
Fee
The city does not state a separate fee on the stand-alone RPA Tree Removal PPR form. If a Chesapeake Bay Preservation Area Board variance is necessary, its application fee is $450. Under the July 2026 Development Services Center schedule, associated single-family RPA site-plan review is $75; a stormwater-plan review, when required, is $205. A separate land-disturbing/stormwater permit is $75, with an inspection fee calculated at 1.5% of specified stormwater construction costs plus $500 per acre of land-disturbing area ($50 minimum). A right-of-way permit, when required, is $100 plus a $10 technology fee and applicable inspection charges. Fees depend on the approval path; other applicable charges may apply.
Processing time
The Development Services Center states that preliminary project requests are reviewed on Tuesdays and written responses are issued within 10 business days. For CBPA Board variances, complete applications filed before the first of the month are scheduled for the following month's hearing; the Board can approve, deny or defer a request. No fixed overall tree-removal approval time is published.
Inspection required
Sometimes

Do You Need a Tree Removal Permit?

Private tree
Sometimes
Street tree
Yes
Diameter threshold
The City’s RPA tree-removal form requires reporting the trunk diameter measured approximately 4.5 feet above ground and the tree height, but does not specify a diameter-based trigger for the stand-alone PPR. CBPA Board guidelines identify removal of approximately 10 or more healthy RPA trees as a potential Tree Removal in the RPA variance category; this is a tree-count criterion, not a trunk-diameter threshold.

Exemptions

The special RPA Tree Removal PPR process applies to trees in the RPA and not to ordinary stand-alone removal on otherwise unregulated private lots outside that area. No general citywide stand-alone tree-removal permit process is identified for ordinary private-yard trees outside special protected areas or approved development/landscape plans. Routine work must still avoid City-owned vegetation, comply with recorded approvals, and obtain any required land-disturbance or other permits. The City does not publish a blanket RPA exemption for dead or hazardous trees; such requests are accommodated through the PPR review.

Protected Trees & Removal Eligibility

Protected Tree Rules

The Chesapeake Bay Preservation Area Ordinance (Appendix F) protects the vegetated Resource Protection Area buffer; proposed tree removal there is subject to City review and approval. State regulation 9VAC25-830-140 requires retaining the vegetated buffer and preserving mature trees where practical. City-owned trees, including City street trees, are separately protected against unauthorized cutting or removal. Trees retained or planted under approved development plans and Appendix E tree-canopy requirements may also be subject to plan compliance.

When Removal Is Allowed

Within the RPA, the City reviews removal requests for reasonable sight lines, access paths, general woodlot management and best management practices that prevent erosion or concentrated runoff. The Virginia Administrative Code allows limited removal of dead, diseased or dying vegetation, invasive/noxious weeds, sound horticultural thinning and shoreline stabilization subject to applicable local standards and review. For vistas, pruning should be preferred to removal when feasible and the fewest mature trees should be removed. The Board may approve, deny or condition proposals requiring a variance.

Replacement Requirements

Replacement required
Sometimes

Replacement Rules

For trees removed to create sight lines or vistas in an RPA buffer, Virginia regulation requires replacement vegetation equally effective at filtering runoff and preventing erosion; replacement trees appropriate to site conditions should maintain the buffer function, with native species preferred. Shoreline stabilization, development and CBPA variance approvals can impose site-specific planting and buffer restoration. Appendix E and approved development plans establish minimum canopy/tree planting obligations, which may require replacement or retention to maintain compliance. No universal one-for-one tree replacement rule for ordinary private-yard removal was established.

Arborist & Professional Requirements

Arborist report required
No

Professional Requirements

The CBPA Board's published Tree Removal in the RPA exhibit checklist says a certified arborist report may be included at the applicant's discretion; it is not a routine required attachment. If a Board variance is needed, the site plan or survey must be signed and dated by the responsible professional. Work on City-owned trees requires City authorization through the Landscape Services Administrator or City Arborist; ordinary private-yard removals have no general City arborist-certification prerequisite identified.

Public Notice Requirements

Public notice required
Sometimes

Notice Rules

For a CBPA Board tree-removal variance hearing, the applicant must post City-provided public-notice signs at the street and waterside at least 15 days before the hearing, and keep them posted until the Board acts. The City mails notices to adjacent owners and advertises in the newspaper and on its website; the sign-posting instructions also address nearby owners across narrow waterways. Missing signs can result in deferral or denial. The stand-alone administrative RPA PPR does not itself carry these Board-hearing notice requirements.

Emergency Tree Removal

The RPA Tree Removal PPR form expressly addresses hazardous trees: applicants must give tree-to-structure distance and photographs showing the tree relative to the structure, with a removal reason for each tree. The published form does not establish a blanket emergency exemption or an automatic after-the-fact approval route. Where a public tree presents a hazard, contact City Park & Landscape Services or report the hazard to the City; emergencies threatening immediate safety should be reported to emergency responders.

Development & Special Areas

Development-Related Rules

The stand-alone RPA Tree Removal PPR is specifically for removal not associated with a development plan or construction. Construction-related tree clearing is reviewed through site-plan, subdivision, CBPA or land-disturbance processes instead. Virginia's Bay regulations direct that mature trees be preserved during development where practicable and removed only when necessary. Project plans in the RPA may require delineation, Water Quality Impact Assessment, construction/tree-protection limits, approved mitigation and related erosion/stormwater permits. The City's Appendix E also sets tree-canopy/planting standards for development; removal must not defeat approved planting or landscape commitments.

Special Zone Rules

In the northern Chesapeake Bay watershed, identify whether the property lies in a Resource Protection Area (RPA) or Resource Management Area (RMA); RPA buffers are especially restricted, typically including a 100-foot vegetated buffer adjoining qualifying tidal waters, wetlands and perennial waters. The City's CBPA map is a preliminary planning guide; site-specific RPA delineation may be needed. Work affecting public rights-of-way/easements requires separate City review; projects in wetlands, shoreline areas or other regulated waters may also require state or federal permits. Erosion/stormwater controls can apply when land disturbance reaches applicable thresholds, including 2,500 square feet for certain projects.

What You Need Before Applying

Requirements

Identify whether the tree is on private land, City property or a public right-of-way, and whether it lies in the Chesapeake Bay Resource Protection Area (RPA) or an approved development/landscape-plan area. For stand-alone RPA tree removal, submit the Tree Removal PPR for City environmental review before removal; larger healthy-tree removal proposals may proceed to a CBPA Board variance. Public trees need the appropriate City written authorization, and clearing connected with construction or grading must comply with applicable development, tree-canopy and erosion/stormwater approvals.

Required Documents

For an RPA Tree Removal PPR: completed form with property owner/applicant contact details and email, property address, a scaled map or survey identifying each tree relative to the house, approximate tree diameter at 4.5 feet above grade and height, species/common name if known, and clear labeled color photographs of each tree's canopy, trunk and root zone. For hazard claims include distance to the structure and photos showing the relationship. State the number of canopy and understory trees and individual reasons for removal. A CBPA Board variance additionally requires a professionally signed and dated site plan/survey, Water Quality Impact Assessment, disclosure statement and fee, as applicable.

How to Apply

Go to Official Application

Official Sources

Last verified: October 8, 2026