ADU Permit in Sacramento, CA

Permit Summary

Permit status
Permit required
Official permit name
Building Permit
Fee
Fees vary with the greater of the Building Official's calculated or contract valuation, project scope, and outside-agency charges. Under the City's residential fee schedule revised July 12, 2026 (CDD-0245), the building-permit fee for a valuation from about $100,000 through $3 million is $1,078 plus $0.006787 per dollar over $100,000; lower valuations use the published fee table. Building plan review is generally 42% of the permit fee; the technology surcharge is 10% of the combined permit and plan-review fees. Additional charges include planning review at 15% of building plan review (minimum $263), fire review at $260/hour and fire inspection at $0.11/square foot (minimum $294), where applicable, plus other City fees, utility and school charges, and legally permitted impact fees. CDD-0419 illustrates approximately $5,271.90 in City-listed charges for a hypothetical 749-square-foot newly built ADU, not a project quote. Optional preliminary ADU zoning review is free.
Processing time
The City's ADU guide estimates building plan review at roughly 1.5–2 months: 20 business days for first-cycle review, 15 business days for a second cycle if needed, and 5 days for a third cycle, excluding applicant correction time. Optional zoning review is estimated at 1–3 weeks. Sacramento City Code §17.228.105(B)(4) provides a 60-day approval/denial period after a complete ADU application for a lot with an existing residential use, subject to statutory exceptions and tolling; preapproved-plan applications may qualify for a shorter state-law review deadline.
Inspection required
Yes

ADU Types & Property Eligibility

Attached ADU allowed
Yes
Detached ADU allowed
Yes
Conversion ADU allowed
Yes
Maximum number of ADUs
Under Sacramento's local development option, a single-unit lot may have up to two ADUs (or an ADU/JADU combination), and a duplex or multifamily lot up to two ADUs. Independently, Government Code §66323 requires approval of qualifying single-family conversions, one qualifying new detached ADU and a JADU where applicable; for existing multifamily lots it permits conversion of qualifying nonlivable space (at least one or up to 25% of existing units) plus up to eight detached ADUs, not exceeding the number of existing primary units; proposed multifamily development may have up to two detached ADUs. The state housing department has expressly rejected the City's prohibition on combining the local and state-authorized allotments; the total possible count is site- and pathway-dependent, not a universal two-unit cap.
Minimum lot size
State ADU law (Government Code §66314(b)(1)) prohibits a citywide minimum lot size imposed solely as a condition of constructing an ADU. The lot must otherwise qualify for a primary residential use and meet applicable objective health, safety and siting rules; limited buildable area does not by itself eliminate the statutory right to qualifying ADUs.

ADU Type Rules

Sacramento authorizes attached, detached and conversion ADUs under City Code §17.228.105 and California Government Code §§66314 and 66323; junior ADUs (JADUs) are a distinct category inside single-family residences. The local ordinance states that its §66314-style option and the state §66323 option cannot be combined, but the California Department of Housing and Community Development's January 20, 2026 findings held that this restriction conflicts with state law and that the full lawful allotment and combination must be allowed. Applicable size, height and setback requirements depend on the specific approval basis.

Lot / Zoning Eligibility Rules

ADUs may be built on qualifying residential or mixed-use lots with a proposed or existing single-family, duplex or multifamily dwelling. Local-option ADUs must comply with applicable objective zone standards where state law permits. Government Code §66323 qualifying ADUs receive ministerial approval without additional local development or design standards. Utility capacity, fire access, environmental hazards, flood conditions, historic resources and protected trees can affect project review, but local standards cannot defeat state-mandated ADU entitlements.

Size, Height & Placement

Maximum ADU size
Sacramento City Code §17.228.105(B)(2) allows each attached local-option ADU up to the greater of 50% of the existing primary residence's floor area or 850 square feet with zero or one bedroom / 1,000 square feet with two or more bedrooms. One local-option detached ADU may be up to 1,200 square feet; two local-option detached ADUs together may have no more than 1,200 square feet. The state-mandated §66323 newly constructed detached single-family ADU pathway is capped at 800 square feet; qualifying conversions of existing space follow the separate state conversion provisions rather than this new-detached cap. JADUs are limited to 500 square feet of interior livable space.
Maximum height
For Sacramento's local-option ADUs, height is generally the maximum height for the primary dwelling in the underlying zoning district, subject to other lawful building and site requirements. State-mandated §66323 detached units use the separate height rules in Government Code §66321, typically at least 16 or 18 feet depending on the parcel and transit circumstances, with certain 20-foot allowances, including alignment of roof pitch. Applicable zone, ADU pathway and building-code conditions determine the limit; no single citywide height applies to every ADU.

Setback Rules

Under the City's local option, a unit within 60 feet of the front lot line ordinarily follows the zone's front setback and an interior side/rear setback of the lesser of the zone requirement or 3 feet; units beyond 60 feet generally have no ground-floor interior side/rear setback, while upper floors have up to the applicable 3-foot/zone standard. Existing-space conversions generally need no new setbacks if the footprint and dimensions do not change. State-authorized new detached ADUs typically use 4-foot side and rear setbacks, and qualifying conversions need no additional setback except fire safety. The state housing department's January 2026 findings reject enforcement of the City's blanket street-side setback and front-setback provisions when they would preclude a state-mandated ADU. Levee-related restrictions and fire-separation rules may also apply.

Lot Coverage / FAR Rules

Sacramento's local-option code applies underlying zone height, lot-coverage and open-space rules but exempts ADUs occupying less than 800 square feet of total lot coverage from maximum lot coverage and minimum open space requirements. ADUs and JADUs are excluded from calculation of dwelling-unit density. Under Government Code §66321, floor-area ratio, lot coverage or open-space rules cannot prevent a qualifying ADU of at least 800 square feet of interior livable space with 4-foot side and rear setbacks; §66323 ADUs are exempt from additional local development standards. Other proposed ADUs may remain subject to lawful zone-specific FAR/coverage rules.

Attached ADU Rules

An ADU may be added to or carved out of an existing primary dwelling, including qualifying attached garage areas, provided it has independent living, sleeping, cooking and sanitation facilities and meets building, structural, fire, energy and egress standards. The local-option attached floor-area cap uses the greater-of formula in the maximum_adu_size rules; qualifying state-law conversions and mandatory 800-square-foot minimum allowances may override restrictive local limitations.

Detached ADU Rules

A freestanding ADU may be constructed on the same lot as the existing or proposed primary residence. Sacramento's local option generally requires 4 feet of separation between a detached ADU and the primary building and between two detached ADUs (the two ADUs may connect to each other); the detached size limit depends on whether one or two are proposed. A new detached unit must meet the governing state or local height/setback path, fire separation, structural and utility requirements. State law grants separate detached entitlements for multifamily properties, including up to eight on qualifying existing multifamily sites.

Conversion ADU Rules

Existing bedrooms or other living area, attached garages, and qualifying existing detached garages or accessory structures may be converted to an ADU with a building permit and independent dwelling facilities. Government Code §66323 protects qualifying conversions within existing physical dimensions, with up to 150 square feet of expansion for ingress and egress where permitted, and generally no new side/rear setbacks beyond fire-safety needs. Some pre-January 1, 2020 unpermitted units may be eligible for the City's AB 2533 checklist and applicable health-and-safety legalization provisions instead of full new-construction treatment.

Design, Occupancy & Parking

Owner occupancy required
No
Parking required
No
Separate sale allowed
Sometimes

Design Standards

Local-option ADUs must meet the City's applicable objective design standards, including its rules governing elevated balconies/decks near side and rear property lines and designated historic properties. Sacramento City Code §17.228.105(B)(2)(c) limits certain balconies, decks and open stair landings within 10 feet of side/rear lines to 3 feet above grade unless adjoining a specified nonresidential area, alley or street. Government Code §66323 ADUs are exempt from additional local design standards. The 2025 California Building Standards Codes apply to construction permitted in 2026.

Owner Occupancy Rules

California Government Code §66315 generally prohibits an owner-occupancy condition for ordinary ADUs; a narrow exception may apply to a qualified-buyer separately sold affordable ADU under §66341. JADUs have distinct rules: effective January 1, 2026, owner occupancy applies when a JADU shares sanitation facilities with the primary residence, but not when it has separate sanitation facilities or qualifies for an institutional-owner exception. Sacramento's older local code broadly requiring JADU owner occupancy was identified as noncompliant by state HCD in January 2026.

Parking Rules

Sacramento City Code §17.608.030(B) provides no minimum off-street vehicle-parking requirement for any land-use type, including an ADU. The City's parking ordinance also removes the need to replace an existing parking space or garage lost when an ADU is built or an existing garage is converted. Voluntary parking must comply with applicable access, paving and safety standards.

Rental / Short-Term Rental Rules

ADUs may be rented, subject to generally applicable landlord-tenant and Sacramento tenant-protection laws. Sacramento's local ADU option allows rentals shorter than 30 days if the operator complies with the City's short-term rental rules (City Code §§17.228.104(C), 5.114), including applicable short-term rental permits; in contrast, ADUs permitted under the §66323 state-mandated path cannot be rented for less than 30 days. JADUs cannot be short-term rentals and, if rented, must have terms longer than 30 days under state law effective January 1, 2026.

Separate Sale Rules

Sacramento City Code §17.228.105(B)(2)(a)(ii) generally prohibits selling or conveying an ADU separately from the primary residence, except the narrowly defined affordable-housing sale authorized by Government Code §66341 (including qualified nonprofit/eligible-buyer conditions). Government Code §66342 separately permits a local government to adopt an ordinance allowing condominium conveyance, but an ordinary Sacramento citywide ADU-condominium separate-sale program was not verified; the state authorization alone does not establish one. A separate conveyance must meet all applicable statute-specific conditions.

Address, Utilities & Trade Permits

Address assignment required
Yes
Trade permits required
Sometimes

Address Rules

Sacramento's ADU application guidance says every ADU needs a newly assigned address and that the address request may take up to four weeks. Applicants use the City's addressing process (Address Request Form CDD-0104) with the relevant site/permit information and plans; additional documentation can be required depending on the property layout. A separate mailing or utility account arrangement does not necessarily follow solely from the new address.

Utility Connection Rules

Plan water, sewer, drainage, electric and any gas arrangements with the relevant service providers. Depending on the parcel, water may be provided by the City or another water supplier; sewer by the City or Sacramento Area Sewer District. Coordinate new or increased electrical service with SMUD and gas service, if proposed, with PG&E. The City may review water/sewer availability and stormwater detention for increased impervious surface. Government Code §66311.5 limits separate connection fees and capacity charges for conversions within existing space and JADUs; requirements and fees differ for new construction and concurrently built primary residences.

Trade Permit Rules

The ADU building permit set must address electrical, mechanical and plumbing work. Separate or associated trade permits, inspections and utility service approvals may be needed depending on whether new circuits/panels, HVAC, plumbing, meters, sewer/water lines, gas systems or rooftop PV are installed or altered. Sacramento's Building Division reviews these disciplines and routes relevant plans to other City agencies and outside utilities; verify permit record requirements when the application is created.

Fire, Energy & Special Requirements

Fire sprinklers required
Sometimes

Fire / Life Safety Rules

Under California Government Code §66314, an ADU does not independently trigger a fire-sprinkler requirement if sprinklers are not required for the primary dwelling; an ADU may need sprinklers where otherwise required under the applicable primary-building or building-code conditions. Plans must address fire-rated separation between structures or property lines, emergency escape/rescue, smoke and carbon-monoxide alarms, access and fire-service review as applicable. Sacramento lists Fire Department plan-review and inspection charges in its 2026 residential fee schedule.

Energy / Solar Rules

ADU construction must comply with the 2025 California Energy Code, applicable Title 24 standards and CALGreen. Under California HCD's 2026 interpretation, newly constructed detached ADUs (other than qualifying exceptions such as manufactured housing) generally require photovoltaic solar systems; panels may be located on the ADU or primary dwelling. ADUs created in existing space, as additions to existing homes, or by converting existing detached nonresidential structures generally do not trigger a new standalone solar mandate. The City's free shelf-ready drawings state they were designed for the 2022 residential code, so current 2025-code and energy/PV updates require verification before using them for a 2026 permit.

Special Area / Overlay Rules

Historic districts and designated landmarks may require specific objective historic-design standards for local-option ADUs. Work near levees may be limited by a landside-toe setback; parcels in flood zones or other environmentally constrained areas may need corresponding code and agency review. City tree rules may require a separate tree permit and tree-protection measures. An ADU covered by Government Code §66323 cannot be denied through extra local zoning or overlay standards barred by state law, although applicable health, safety and environmental protections remain relevant.

Development / Impact Fee Rules

Effective January 1, 2026, California Government Code §66311.5 exempts ADUs with 750 square feet or less of interior livable space, and JADUs with 500 square feet or less, from local-agency, special-district and water-corporation development impact fees; impact fees on larger ADUs must be proportionate to the ADU versus the primary residence. School impact fees may apply to ADUs exceeding 500 square feet, and legally permissible water/sewer connections and capacity charges are distinct from impact fees. Sacramento's July 2026 illustrative fee worksheet still applies park, flood-control and transportation impact-fee line items to its 750-square-foot example although current state law exempts ADUs at or below 750 square feet; the controlling state exemption takes precedence. Other City permit, inspection and valuation-based charges are not automatically waived.

Preapproved Plans

Preapproved plans available
Yes

Preapproved Plan Rules

Sacramento publishes three free City-developed detached-ADU 'Shelf Ready Plans': a 367-square-foot studio, 559-square-foot one-bedroom model and 747-square-foot two-bedroom model. These are reusable plan packages, not an issued permit, and require a parcel-specific site plan and review; modifications other than mirroring are restricted. They expressly cite 2022 residential-code compliance, so applicants must address 2025 codes now in effect. The City also has an AB 1332 program to preapprove privately submitted detached-ADU plans, but its public 'Available Preapproved ADU Plans' list did not show specific designs on verification; shelf-ready plans should not be confused with an independently approved AB 1332 listing.

Permit & Review Path

Permit / Review Path

Create an account in Sacramento's Public Permit Portal and start the building plan-review workflow, including the portal's Planning 'Building Permit Submittal Clearance' step, then upload the building application and EPC-compliant plans. The City says no separate advance zoning approval is required; Optional Zoning Review (CDD-0009) is a nonmandatory preliminary check now free of charge. City Building routes the plans for zoning, structural, fire, utilities and other required reviews, issues corrections as needed, and releases the permit after approvals and fee payment. Ministerial ADU rights under Government Code §§66314 and 66323 apply; a 2026 state housing department findings letter identifies Sacramento ordinance provisions that cannot lawfully reduce the state ADU allotment or block qualifying ADUs.

Inspections

Inspection Stages

For typical new wood-frame ADUs Sacramento lists required inspections for site grading/drainage and underground utilities; foundation; wall/roof framing and shear; rough structural, plumbing, mechanical and electrical; insulation; applicable stucco lath, gypsum board and gas tests; and final building plus trade inspections. Modular or conversion projects may follow different inspection sequences. Occupancy follows approval of all required final inspections. The City references foundation-specific inspection checklists CDD-0339 and CDD-0401.

What You Need Before Applying

Requirements

Obtain a building permit before establishing an attached, detached, or converted ADU on a parcel with an existing or concurrently permitted primary dwelling. Submit a complete electronic building-plan-check package and show compliance with applicable 2025 California building, residential, energy and fire codes; current state ADU law; City land-use standards to the extent consistent with state law; and utilities, drainage, trees, access and site safety requirements. The City reviews zoning, building and other applicable matters within the permit workflow; its advance ADU zoning review is optional.

Exemptions

Sacramento states a building permit is required for every ADU; there is no general ADU building-permit exemption for attached units, detached units, conversions or existing unpermitted units. A separate discretionary planning or zoning approval is not normally required before filing the building application, and the preliminary ADU Optional Zoning Review is not mandatory. Qualifying older unpermitted ADUs may have an alternative legalization/safety review pathway, but are not exempt from approval.

Required Documents

A building permit application and electronic plan set showing parcel/assessor information and existing and proposed uses; a dimensioned site plan with lot lines, setbacks, structures, access and utilities; architectural floor plans, elevations and sections; structural/foundation plans and calculations as applicable; energy compliance documentation and solar/PV information where required; electrical, mechanical and plumbing information; and a request for a new ADU address. Site conditions may require drainage/stormwater plans, tree documentation, utility clearances, fire or grading details, owner authorization, and other supporting material. Use the City's EPC submittal/checklist instructions.

How to Apply

Go to Official Application

Official Sources

Last verified: November 1, 2026